Automated Job Submission in CONTROL-M
Ibm production tool CONTROL-M materiel, CONTROL-M Interview questions
And Answers For Automating Job Scheduling in CONTROL-M
Once a job has been placed in the Active Jobs file, the CONTROL-M
monitor does not submit the job unless all its runtime scheduling criteria, as
defined in the job scheduling definition, are satisfied. Several types of
runtime criteria can be defined.
Runtime Criteria
Criteria Description
Time ------> Submission must occur during a specified time range.
Priority ------> Jobs can be assigned internal priorities, so that if two jobs are
ready for submission at the same time, the higher-priority job is
submitted first.
Due Out -------> If two jobs with the same priority are ready for submission, the
job with the earlier due out time is submitted first
No comments:
Post a Comment